Experience The Super
Structure Steel Frame Advantage...

100% High Quality Projects - Modern Rapid Construction - Light - Strong - Better!

WHY LIGHT STEEL FRAME?

The Modern Way To Build…  In today’s modern world, where demand is greater than supply the need for modern construction method is required, light steel framing is the answer designed & perfect for Project Owner, Developer or Builder.  This construction method provides a way to turn opportunity into commercial reality, faster than ever before – at the same time delivering better quality structure that meet the demands of modern communities.

FAST

Super-Structure Built in As Little As One Week. Roof Sheeting Installed w/in the Second Week. Fewer Delays Due To Rain & Climate Disturbance. Shorter Project Timeline.

STRONG

High Strenght To Weight Ratio. Engineered For Super Typhoon. Can withstand a grade 8 Earthquake level. Others Good Reasons: Fire, Termite, & Moisture Resistant.

SMART

70% Cooler Than Conventional Homes. Save Money On Electrical Bills. Service Hole Pre-Punched For Electricity. Plumbing, Cable, Computer Etc. VALUE FOR MONEY - Save Money.

SUPERIOR METHOD

Superior construction system that is Incredibly Accurate.

LESS LABOUR

Highly - Skilled labor on-site not needed. Steel pre-fab advantage

MODERN TECH

System hold many advantages over traditional construction techniques

FAST TURN-AROUND

Greater return on your investments (ROI) . More projects & business deals.

REDUCED - COST

Replace costly structural steel designs & heavy equipments.

TERMITE PROOF

Steel is 100% termite & borer proof. Zero termite treatment.

DESIGN FLEXIBILITY

Greater strength-to-weight ratio for longer spans

EASY TO INSTALL

Simple, lightweight & NO welding works. Easily erected w/ basic tools.

RELIABILITY SUPPLY

In-house fabrication with established supply chain

TECH EXPERTISE

Commited to support you & your business

NON-COMBUSTIBLE

Frame made from steel won't catch fire.

SUSTAINABLE

Steel is 100% recyclable. (The Steel Adantage)

Light Steel Frame construction  system is Incredibly accurate, reducing the need for engineer involvement during the detail design, speeding up compliance, reducing engineering cost and minimizing room for error on-site.  All frames are pre-assembled, strong and straight, and clearly identifiable. No on-site welding or cutting is normally required. This means that the erection process is fast and simple – requiring less labor time on-site and heavy-lifting equipment.  Steel do not absorb moisture so there is no delay waiting for frames to dry. This means minimized weather delays for rain, or excessive heat, for example.  LSF.PH construction can offer a much more predictable construction schedule and less on-site cost than traditional construction methods.  All material is lightweight, no heavy lifting equipment is needed on-site, frames, trusses and joists can typically be carried into place by on-site labor.  Frames are made to precise dimensions meaning pre-made windows, doors and bathrooms will fit perfectly and quickly reducing engineering cost and minimizing room for error on-site.  LSF.PH requires no welding or riveting in assembly and is easily erected on site with basic tools.

"Accelerated Construction Time - Capable Of Delivering Up-to Twenty Five (25) Projects In A Month"

Speed Up Your Project! The Advance Modern Way...

"Subok Tibay At Mabilis Na Gawa, Sigurado At Perfecto Sa Desenyo Kaya Tipid. Sa Light Steel Frame System, Proyekto Sigurado!
www.LightSteelPH.com
Mr. Emmanuel Javier
Head Architect | Designer
Light Steel Frame - Philippines
"As building structure professional, i choose Light Steel Frame - Phils. for my construction projects simply because, this modern engineering solution helps me shorten my construction cycle thus saving me more time, equipment and labor costs. The wall floor & roof sections are assemble at the factory in a controlled environment w/c minimizes weather delays lowers my overall labor costs reduced construction waste and ensures greater quality control since all components are delivered to the site w/ exact measurements. Lastly, my financing is even lower than traditional construction method as I could get in and out of projects much faster while at the same time delivering higher standard quality building project to my valued clients. When my customers are happy, I’am happy"
www.LightSteelPH.com
Mr. Francis Dela Cruz
Architect | Contractor | Consultant
FFO+ Architect
"With Light Steel Framing Construction, Ang Proyekto Ay Maganda, Garantisadong Dekalidad Lahat ng Materiales (No Sub-Standard), At 100% High Performance Structure... Let's Build The Smart Modern Way!"
Mr. Iver Valera
Sales Head (Luzon/Visayas)
Light Steel Frame - Philippines

Let's Create Your Next Steel Project!